BIM

BIM

BIM   CHAIRMAN OF THE COMMITTEE AND SUB-COMMITTEES: NICOLAS REGNIER – DATA SOLUCE   The BIM committee has been broken down into sub-committees BIM 4 VALUE BIM COMMITTEE Contact the Committee Chairman BIM FOR VALUE SUB-COMMITTEE LISTE DES CONTRIBUTEURS . . ....
BIM

Multi-use building

Multi-use building   CHAIRMAN OF THE COMMITTEE AND SUB-COMMITTEES: André Vidalou – SBA Drawing on the widespread acceptance of digital technology, the Hospitality Department organises the multi-use services associated with the transformation and pooling of...
BIM

BIM4VALUE Frame of reference

BIM4VALUE Frame of reference Seven building sector players have joined forces to offer a frame of reference based on the uses of digital modelling from the programming stage to operation and maintenance. The goal is to provide users and investors alike with improved...
BIM

R2G frame of reference

Frame of reference Ready 2 Grids (R2G) IN THE FUTURE THE BUILDING SHOULD ALSO Flexibly interact with the energy distribution system Control and predict its load curves BE READYTOGRIDS WITH 3 LEVELS Communicating: Able to communicate energy data (its consumption,...
BIM

R2S frame of reference

R2S frame of reference A LABEL: READY TO SERVICES (R2S) In collaboration with the certifying body Certivéa, the SBA has established this label for Commercial Buildings. It is a baseline that sets out the requirements to be met by a Smart Building, an open and...

Nous utilisons des cookies sur notre site

En poursuivant votre navigation sur ce site, vous acceptez l’utilisation de cookies pour vous proposer des contenus et services adaptés à vos centres d’intérêts. Plus d’informations